Road pavement at the Dhaka Metro Rail project

Completed

Reconstruction of the road pavement beneath the elevated Metro Rail viaduct between Mirpur-10 and Sher-e-Bangla Nagar for Italian-Thai Development, carried out on a live urban road with traffic maintained alongside the works.

Project facts

Client
Italian-Thai Development Public Company Ltd.
Location
Mirpur-10 to Sher-e-Bangla Nagar, Dhaka
Contract value
BDT 215.0 M
Status
Completed

Single contract value as listed in the company profile, the largest in the register.

Project photographs

Scope

  • Breaking out the existing pavement with an excavator-mounted hydraulic breaker and by hand
  • Excavation of the pavement trench between the viaduct piers
  • Spreading and levelling of brick aggregate sub-base in the excavated trench
  • Compaction of sub-base and base course with walk-behind vibratory rollers and tandem rollers
  • Field density testing of each compacted layer before the next course
  • Traffic management with water-filled barriers on a road kept open to traffic