Road pavement at the Dhaka Metro Rail project
Italian-Thai Development Public Company Ltd.
BDT 215.0 MCompleted
Emergency repair of temporary protective works on the eroding Meghna River bank at Nolchira Ghat for the Bangladesh Water Development Board, delivered as 67 work packages across two contracts on the island of Hatiya.
Sum of the 39-package contract (BDT 107,745,632) and the 28-package contract (BDT 79,299,095), both marked ongoing in the profile.

Italian-Thai Development Public Company Ltd.
BDT 215.0 MCompleted

SUEZ OTV Veolia
BDT 851.2 MOngoing and completed
Sum of 50 contracts as reported

Bangladesh Army (34 Engineering Construction Brigade)
BDT 11.0 MOngoing
Sum of 2 contracts as reported

Penta Ocean Construction Co. Ltd.
BDT 142.4 MCompleted
Sum of 2 contracts as reported